Filter search results
Publication type
Topic
Publication date
11 publications
Ministerial Advisory Group for Architecture and the Built Environment response to the DSD consultation - Route Options for Belfast Rapid Transit.
The TSNI collects information on how and why people travel within Northern Ireland. Three years of data need to be combined to ensure the analysis carried out is robust. The in-depth report is produced annually and contains detailed results and trend data.
Sets out the environmental statement for the A6 Londonderry to Dungiven dualling scheme.
The A5/A2 West Link initial feasibility study of high level options has been carried out to establish the feasibility of building the A5/A2 West Link in terms of route alignment and key environmental constraints.
Sets out Stage 2 Scheme assessment reports prepared for the Londonderry to Dungiven dualling scheme.
Sets out the draft Statutory Order notice for the A6 Londonderry to Dungiven dualling scheme.
Sets out the draft Direction Order published for the A6 Londonderry to Dungiven dualling scheme.
Sets out the draft Stopping-Up Orders published for the A6 Londonderry to Dungiven dualling scheme.
Sets out the A6 Londonderry to Dungiven draft Vesting Order Part 1 Caw roundabout to Maydown roundabout
Sets out the A6 Londonderry to Dungiven draft Vesting Order Part 2 Mobuoy Road to Derrychrier Road.
Sets out the A6 Londonderry to Dungiven draft Vesting Order Part 3 Derrychrier Road to Crebarkey (Dungiven bypass)